设为首页收藏本站

简体中文 繁體中文 English 日本語 Deutsch 한국 사람 بالعربية TÜRKÇE português คนไทย french

搜索
热搜: 活动 交友 discuz

SoftLayer达拉斯机房维护 [复制链接]
查看:12 | 回复:0

537

主题

5891

回帖

1万

积分

论坛元老

积分
13519
发表于 2011-2-4 13:30:20 | 显示全部楼层 |阅读模式
SoftLayer达拉斯机房维护

SoftLayer Scheduled Backbone Maintenance [02/06/2011]
Date: Sunday, February 6, 2011 (02/06/2011)
Start Time: 12:00 AM CST
End Time: 02:00 AM CST
Services affected: Public / Private
Location: Global
Duration: 2 hours
* Short Notice Maintenance *

SoftLayer Engineers will be conducting maintenance on the SoftLayer Global Backbone in an effort to better optimize traffic traversing various links in/out/through of the Dallas facility.  During this maintenance, Engineers will be building various LSPs (label switched paths) within the MPLS backbone.  Because these paths carry public and private traffic, the following services may see sporatic latency and/or packetloss during this maintenance:

- Public network connectivity in/out of the Dallas facility destined for other datacenters or POPs with peering.
- Private network connectivity in/out of the Dallas facility destined for Seattle or Washington, DC.

Devices:

BBR01.EQ01.DAL03
BBR02.EQ01.DAL03

As always, Engineers will make every attempt to mitigate the impact to customer traffic; however, this notice was sent out to all customers to ensure there was no confusion in the event of degraded service for the duration of this maintenance.
您需要登录后才可以回帖 登录 | 立即注册

论坛客服/商务合作/投诉举报:2171544 (QQ)
落伍者创建于2001/03/14,本站内容均为会员发表,并不代表落伍立场!
拒绝任何人以任何形式在本论坛发表与中华人民共和国法律相抵触的言论!
落伍官方微信:2030286 邮箱:(djfsys@gmail.com|tech@im286.com)
© 2001-2014

浙公网安备 33060302000191号

浙ICP备11034705号 BBS专项电子公告通信管[2010]226号

  落伍法律顾问: ITlaw-庄毅雄

Archiver|手机版|Discuz! X

GMT+8, 2026-6-14 15:59 , Processed in 0.017520 second(s), 4 queries , Gzip On, Redis On.

返回顶部